
Location: Meta Dpt., Colombia
Client: PACIFIC (PRE)
Scope: Engineering for Production Facilities and Infrastructure for Quifa and Rubiales Fields (CPF1 and CPF2), 90% BSW with water cut up to 95%. It Includes 10 Water Treatment Plants Production 150 KBPD.
Capacity CPF: 170 MBPD.