Location: Anaco, Anzoátegui State / Venezuela

Client: PDVSA GAS, S.A.

Contract Amount US$: 29,00 MM

Contract Type: Lump Sum

Date: November 2008  – August 2011

Scope:  Basic and detailed Engineering for CO2 elimination plant of natural sour gas. The modifications include the following facilities and requirements: amine absorption units; scrubbers at inset and outset of gas; demineralized water plant; hot oil systems, water for utilities, plant and instrument air and combustible gas; residual water treatment unit; closed drainage and nitrogen system; chemical product injection, among others.

Capacity:  2,200 MMSCFD